Index of Tables

Table 1.1

Land management units used for reporting in the Annual Environmental Report 2001

Table 2.1

Number of farm units where NRM has been demonstrated to landholders

Table 2.2

Landowner contributions to LWMP works

Table 2.3

Timetable for implementation of the Kerarbury Channel LWMP

Table 4.1

Participation in the Education Program 2000/2001

Table 4.2

Participation since the commencement of the Education Program

Table 4.3

Number of farms where Education Program has been completed or the landholder has completed >1 unit

Table 5.1

CICL's Research &Development commitments

Table 5.2

LWMP publications

Table 5.3

External Audits/Reviews of CICL business 2000/2001

Table 5.4

Audited LWMP finance report

Table 6.1

Property transfers within the CIA

Table 6.2

Announced water allocations for 2000/2001

Table 6.3

Monthly diversions and DLWC credits

Table 6.4

Water deliveries to the three LWMP areas (ML)

Table 6.5

Monthly transmission usage as a percentage of monthly diversions

Table 6.6

Volume of water diverted (ML) for DLWC purposes and preceding six-year average

Table 6.7

Number of external water transfers and their volumes

Table 6.8

Summary of water allocation and usage in 2000/2001 (not including transmission usage)

Table 7.1

Groundwater usage in CICL's operational area

Table 7.2

Monthly groundwater extractions from Colbore 1994/95 to 2000/2001

Table 8.1

Monthly temperatures recorded at Griffith

Table 8.2

Irrigated crop areas within CICL's operational area

Table 8.3

Crop water usage and proportions of total deliveries for crops in CICL's operational area

Table 8.4

Comparison of major land uses in CICL's operational area in the past three years

Table 8.5

Irrigation intensities for farms within the CIA

Table 8.6

Rice areas in the Kerarbury Channel and Outfall District LWMP Areas

Table 8.7

Total rice areas and surface water use in CICL's area of operation

Table 8.8

Comparison of rice water usage for blocks in the CIA over the last three seasons

Table 8.9

Summary rice water usage CICL's area of operation 2000/2001

Table 8.10

Breaches of the Rice Policy during 2000/2001

Table 8.11

Breaches of the Rice Policy since 1994/1995

Table 8.12

Summary of Rice Policy breaches in the CIA and Kerarbury area

Table 9.1

Number and proportion of farms for which field surveys, interpretation and information packages have been commenced/completed

Table 9.2

Number of farm units where WFPs have been completed or are in progress

Table 10.1

Areas of the CIA with piezometric level in various ranges (5-12m)

Table 10.2

Areas of the CIA with piezometric level in various ranges (12-35m)

Table 10.3

Areas with piezometric level in various ranges (5-12m) in the four regions of the CIA

Table 10.4

Areas with piezometric level in various ranges (12-35m) in the four regions of the CIA

Table 10.5

Rate of rise in piezometric levels in the CIA

Table 10.6

Variation between September and March piezometric levels (metres)

Table 10.7

Areas with piezometric level in various ranges in the Kerarbury Channel Area (12-35m)

Table 11.1

Piezometer salinity data in various ranges

Table 11.2

Median groundwater salinity (mS/cm) by region

Table 12.1

Calivil piezometric level summary for the CIA

Table 13.1

Salinity Project - site description

Table 14.1

Summary of seepage investigations and treatments since 1993/1994

Table 15.1

Data Recovery Summary for CCD, DC800A and CODD

Table 15.2

Data Recovery Summary for CODA

Table 15.3

Drainage flows (ML) at licensed discharge points

Table 15.4

Drainage flows (ML) at CODA

Table 15.5

Total drainage, DLWC drainage credits and CICL drainage flows (ML)

Table 15.6

Monthly salinity readings (mS/cm) at licensed discharge points

Table 15.7

Monthly salinity readings (mS/cm) at CODA

Table 15.8

Monthly salt load (tonnes) at licensed discharge points

Table 15.9

Monthly salt load (tonnes) at CODA

Table 15.10

Monthly diversions, salinity and salt loads of water entering CICL's operational area in 2000/2001

Table 15.11

Salt loads diverted to Tombullen Storage in 2000/2001

Table 15.12

Salinity management program summary

Table 15.13

Indicative summary water balance

Table 15.14

Total phosphate summary (mg/L)

Table 15.15

Total nitrogen summary (mg/L)

Table 15.16

Turbidity summary (NTU)

Table 15.17

pH summary

Table 15.18

Molinate sample summary 1995 to 2000

Table 15.19

2000/2001 - pesticide analysis summary (mg/L)

Table 16.1

CICL's chemical usage

Table 18.1

External training for CICL staff

Table 19.1

List of licence conditions

© Coleambally Irrigation 2001